New Lawns Installations

Start fresh with a level, healthy lawn that takes root fast and drains right. CC Landscape Inc. grades, preps soil, and installs premium sod or hydroseed for dense, even turf that stands up to Pacific Northwest weather.

Two people walking near an old house, winter scene.

Why Choose CC Landscape Inc. for New Lawns

Experience that shows

With 13+ years in the trade, we know how to build around Oregon’s soil and weather.

Built on proper prep

Grading, compaction where needed, and soil amendments for root-friendly structure.

Clean finish

Tight seams, consistent grade, and tidy edges at beds, paths, and hardscapes.

Clear process

A single point of contact, written scope, and updates until final walkthrough.

Lawn Options We Install

Premium sod

Instant curb appeal with established turf for fast use and even coverage.

Hydroseed

Cost-effective, high-coverage seeding with fiber mulch and tackifier for germination and erosion control.

Overseed + leveling

For select projects, we can repair, topdress, and overseed to refresh tired turf.

Design Options

Choose cool-season grass types suited to our region (e.g., fescue blends, perennial rye). We’ll match turf to sun/shade, traffic, irrigation capacity, and maintenance preferences. Edging, bed shapes, and transitions are planned to be mower-friendly and clean.

Scattered green leaves on white background

Our Installation Standards

Site preparation

Remove debris and old turf (as needed). Rough grade to proper contours and elevations

01

Soil improvement

Incorporate compost/topsoil and amendments based on site conditions; final grade for smooth surface and water flow.

02

Irrigation check

Verify sprinkler coverage and zoning; adjust heads for head-to-head coverage before turf goes down.

03

Turf installation

Lay sod in staggered joints with tight seams, or apply hydroseed slurry evenly at the right rate.

04

Roll, water-in, and cleanup

Roll sod for contact, set initial watering schedule, and leave the site clean and ready.

05
Person unrolling sod on soil surface

Timeline and Expectations

Most sod projects complete in one to two days once on site; hydroseed timing varies with weather and area. You’ll receive a clear schedule, progress updates, and a final walkthrough with watering and first-mow guidance.

Care and Maintenance

For sod: Water deeply and frequently the first 10–14 days, then taper. First mow when the grass reaches about 3–3.5 inches.

For hydroseed: Keep the surface consistently moist through germination; expect full fill-in over several weeks depending on temperature and sun.
We’ll provide simple, site-specific care instructions for a strong start.

Modern backyard with patio furniture and green lawn

Service Areas

Frequently Asked Questions

Sod gives instant coverage and is ready faster; hydroseed is budget-friendly and great for large areas. We’ll recommend based on your site, timeline, and budget.

We grade for positive drainage and adjust soil profile to help water move through and off the surface.

Sod typically allows cautious use in 2–3 weeks; hydroseed timelines vary with growth and weather.

Yes, we can adjust or add zones/heads as part of installation if needed.

Get a Quote

Tell us about your yard and goals. We’ll recommend the best turf type and installation method for your site and budget.

Limited Time Offer!

Get $500 Off New Patio, Walkway, & Retaining Wall Installations!

For a limited time, we’re offering $500 off new hardscape installations. Spots fill quickly, so don’t wait.

📞 Call for a free estimate 503-710-1378